اینستاگرام ما

ما را فالو کنید

Ministry of Power (Central Building)

Name : Ministry of Power (Central Building)
Location : karaj
General Specification :
  • Installation System: Hang& Curtain Wall
  • Panel :4mm Alpolic/fr
  • Color : Champagne Metallic​
  • Quantity :  7000 m2
  • Start Date :2002
  • Installation Period :14 months
  • Owner : Armeh Tab Co.
  • Consultant : Paramadan Consulting Engineers
  • Installer :  Al-Tech Co.
  • Design :Al-Tech Technical Office
Technical Specification
  • Structure : Concrete
  • Levels :8
  • Function :Official
  • Other Materials: : Stone
  • Distance Between ACM: 
  • surface & Structure :25 cm
  • Special Details :
  • Roof Flashing :  Alpolic/fr Panels
  • Sealing System : Silicon Sealant​
Comments

  • تاریخ
  • اعضا
  • مدت زمان
  • Category
  • برچسب
  • اشتراک